HI WORLD looking forward to your approval,                          
                                                        We committed to creating the perfect design and best machine.                  
                                                                                                                   

1, shredders fixed job, should be fixed on the cement foundation. If the workplace is constantly changing, metal pulverizer with the motor to be installed in the base unit with angle iron produced. Grinder with diesel engine for power, so that the two power matching, slightly larger than the grinder power diesel engine power, consistent and both pulley groove. Pulley outer end surface to be in the same plane. 2 must be checked before starting metal shredder unit connecting bolts are tightened, the suitability of the tightness of the drive belt, the power cord is good. The motor shaft shredders axis is parallel. 3, check whether the hammer, sieve pore size is appropriate for damage. Hand dragging the belt, check the spindle rotation is flexible, with or without card, touch and friction phenomenon. 4, after the boot, first make the device idle for 2-3 minutes, check the rotor turning is correct, the sound is normal. Only at the rated speed until smooth rotation work. 5, work and pay attention to operation of the shredder feeding should be uniform to prevent blocking boring car, not to overload of work for a long time. If there is vibration, noise, bearing and body temperature is too high, spray material outward phenomenon should immediately stop checks, troubleshooting before they can continue to work. Crushed material should be carefully checked, shall not be mixed with stones, metal and other foreign matter, in order to avoid damage to the machine. 7, when the machine is running, the operator shall not leave the unit, nor disassemble observed in the operation to smash the indoor work, repair tools may not be placed on the machine or filler. 8, operators do not wear gloves, clogging, non reaches into the filler bucket, feeding should be standing on the grinder side to prevent rebound debris injuring facial. 9, after the end of the work, do not immediately shut down, should be idling for 2-3 minutes, so that the machine within the material is fully discharged. Cleaning, maintenance work should be carried out after the shutdown. 10 source through metal hammer crusher is the main wearing parts wear whether it is in the same direction after exchange swap angular corners or turn around should the whole group hammer exchange replaced at the same time when replacing the new Hammer films but also the entire hammer can not use a single hammer new for old. The sieve of wearing parts, such as sieve damage can be riveting complement seriously damaged you need to replace a new screen films. 11, metal pulverizer operating 300 hours to clean the bearings, replace the oil. Long-stay parking, you should remove the belt. 
CopyRight @ 2016 HongrunCrusher | All Rights Reserved